Production unit no. The EDF Cruas – Meyse power station was put on planned shutdown at 6 a.m. on Thursday, July 7.
This manipulation will allow you to renew 25% of your fuel, and perform control and maintenance operations. No. The production units no. 1 and 2 are operational and supply the national electrical grid, while no. Since February 2022, 4 has been in a scheduled maintenance shutdown.